top of page
Past Projects
View Some of Our Past Projects
Gateway WA - Perth Airport & Freight Access Project (2013-2016)
Client: Main Roads WA
Project Description: Revegetation and landscaping works including the supply and install of 700,000 tubestock seedlings, 2,600 advanced trees, as well as supply and direct seeding of over 50 kg of native seed. Maintenance works included infill planting of a further 490,000 tubestock, over 100 kg of native seed and weed control over an area in excess of 100 Ha.
Project Description: Revegetation and landscaping works including the supply and install of 700,000 tubestock seedlings, 2,600 advanced trees, as well as supply and direct seeding of over 50 kg of native seed. Maintenance works included infill planting of a further 490,000 tubestock, over 100 kg of native seed and weed control over an area in excess of 100 Ha.
Kwinana Freeway Widening - Armadale Road (2016-17)
Client: Brierty Ltd
Project Description: Revegetation and landscaping works including the development of the Revegetation & Landscaping Design Plan, supply and install of topsoil and mulch, pre- and post-planting weed control, as well as the supply and install of 25,000 tubestock seedlings, and supply and direct seeding of over 50 kg of native seed.
Project Description: Revegetation and landscaping works including the development of the Revegetation & Landscaping Design Plan, supply and install of topsoil and mulch, pre- and post-planting weed control, as well as the supply and install of 25,000 tubestock seedlings, and supply and direct seeding of over 50 kg of native seed.
Optus Stadium Precinct
Client: Public Transport Authority (PTA)
Project Description: Landscaping, revegetation and minor earthworks across three projects - 1.) Burswood Bus Layover Facility; 2.) Camfield Drive Extension; & 3.) Windan Bridge Shared Paths.
Project Description: Landscaping, revegetation and minor earthworks across three projects - 1.) Burswood Bus Layover Facility; 2.) Camfield Drive Extension; & 3.) Windan Bridge Shared Paths.
New Norcia Bypass (2017/18)
Client: Decmil Southern Pty Ltd
Project Description: Revegetation of the Great Northern Highway Bypass in accordance with the landscape design. Implementation of a maintenance and monitoring programme including weed control, infill planting and seasonal monitoring and reporting.
Project Description: Revegetation of the Great Northern Highway Bypass in accordance with the landscape design. Implementation of a maintenance and monitoring programme including weed control, infill planting and seasonal monitoring and reporting.
Mill Street Compensating Basin (2017)
Client: Water Corporation (Watercorp)
Project Description: Revegetation works including the supply and install of 8,800 tubestock to the batters of the basin. Tubestock were planted into jute matting on the batters, which required pre-cutting of the jute matting before tubestock could be planted into the batter through the holes.
Project Description: Revegetation works including the supply and install of 8,800 tubestock to the batters of the basin. Tubestock were planted into jute matting on the batters, which required pre-cutting of the jute matting before tubestock could be planted into the batter through the holes.
Esperance Port Access Corridor (2014-18)
Client: John Holland Group Pty Ltd
Project Description:
Initial implementation of the revegetation and landscaping works. Maintenance program included environmental weed control and infill planting.
Project Description:
Initial implementation of the revegetation and landscaping works. Maintenance program included environmental weed control and infill planting.
Joondalup Railway Line Extension (2014/15)
Client: Public Transport Authority (PTA)
Project Description: Revegetation and
landscaping works including supply and install of planting substrate and mulch, tubestock and pre-& post-planting weed control. Maintenance program of environmental weed control and infill planting.
Project Description: Revegetation and
landscaping works including supply and install of planting substrate and mulch, tubestock and pre-& post-planting weed control. Maintenance program of environmental weed control and infill planting.
Southern Suburbs Rail Extension (2010)
Client: RailLink JV
Project Description: GHEMS provided a turn-key solution for the revegetation and landscaping works, which included project management, revegetation plan development, grass-tree and zamia palm recovery, site-preparation (including topsoil and mulch spreading), supply and install of native seed, seedlings and mature trees, followed by a four (4) year maintenance period of infill planting, weed control, and monitoring and reporting.
Project Description: GHEMS provided a turn-key solution for the revegetation and landscaping works, which included project management, revegetation plan development, grass-tree and zamia palm recovery, site-preparation (including topsoil and mulch spreading), supply and install of native seed, seedlings and mature trees, followed by a four (4) year maintenance period of infill planting, weed control, and monitoring and reporting.
Cardup Landfill Revegetation (2012-14)
Client: West Australian Landfill Services Pty Ltd
Project Description: Revegetation of the South Cardup (Byford) landfill site, including annual environmental monitoring. Installed 24,000 tubestock and 1,000 mature trees across the entire site.
Project Description: Revegetation of the South Cardup (Byford) landfill site, including annual environmental monitoring. Installed 24,000 tubestock and 1,000 mature trees across the entire site.
Contact Us
72 Grey Street
Bassendean WA 6054
Phone: (08) 9373 7100
Email: enviro@ghems.com.au
Pest Control Licence 1320
© 2022 by GHEMS Holdings Pty Ltd
bottom of page