Projects: Mulching and erosion control

Southern Suburbs Railway, Jandakot to Mandurah WA

Client:                            Rail Link Joint Venture

Project Description:  The supply of all environmental landscaping and revegetation                                         components along the Perth to Mandurah Rail link project from
                                        Glen Iris to Mandurah.

Total Area:                   110 hectares

No. Plants:                    500,000 (approx.)

Equipment used:         D3 and D6 dozer, tracked bobcat, excavator, range of 4WD vehicles,
                                         weed spraying and watering rigs

Project Duration:        Two (2) years works plus three (3) years monitoring

________________________________________________

Adaro Coal Mine, Kalimantan Indonesia

Client:                             Adaro Coal Mining

Project Description:   Provision of comprehensive revegetation contracting works utilising                                         mostly forage trees and improved pasture species to provide rapid
                                        erosion and sediment control to areas impact by the mining operations.

Total Area:                   100 hectares (approx.) in 2005

Equipment used:         Hydroseeder range of 4WD vehicles

Project Duration:        Ongoing – three (3) years to date